Take flowmetering technology to 20,000 psi.
The Parque das Conchas (BC-10) fields lie in water depths ranging from about 5,000 ft to 6,500 ft in the Campos basin offshore Brazil. The subsea fields are tied back to an FPSO vessel, which has a processing capacity of 100,000 bbl of oil equivalent per day. Constant swells and hostile conditions at the seabed create significant technical challenges for operations.
Brazilian regulatory requirements mandate periodic well tests during production. Traditionally, deepwater well testing requires complicated infrastructure both subsea and topside, which not only makes the field development more complicated but also increases project installation time, risk, and cost. The operator required a reliable, cost-effective solution that would enable real-time well monitoring while satisfying the stringent regulations.
The PhaseWatcher subsea multiphase flowmeter with Vx technology is specifically designed to provide critical well diagnostics without the complexity of conventional testing operations. The compact flowmeter measures individual fluid phases in real time without separation and provides flow rate measurements throughout the life of the field.
Before using the flowmeter, the operator needed to obtain authorization from the regulator, Agência Nacional do Petróleo (ANP). The approval process—the first of its kind in Brazil—involved obtaining authorization to
The operator and OneSubsea worked collaborated to present the case to ANP and obtained authorization. In the first phase of the project, eight PhaseWatcher flowmeters—one per well—were configured and successfully installed in retrievable arrangements on the subsea trees.
Less topside equipment reduced the number of risers required, saving the operator USD 10 million. Additionally, eliminating the need for a test separator saved an additional USD 2 million and reduced the deck footprint. The continuous, high-resolution well flow measurements provided in real time by the PhaseWatcher subsea flowmeters were superior to the data obtained from conventional well test equipment, such as test lines, manifolds, and separators. The improved monitoring helped increase production by 1,000 bbl/d and enhanced overall recovery. Pleased with the results, the operator decided to also use the flowmeters in subsequent stages of the project. A total of 21 PhaseWatcher flowmeters were installed, resulting in further savings and production gain.
Challenge: Improve production well testing economics while meeting stringent regulatory requirements in the deepwater Campos basin offshore Brazil.
Solution: Deploy PhaseWatcher subsea multiphase flowmeters with Vx technology instead of conventional well test equipment.
Results: